CS605
|
Degree Of Uncertainty That The Product Will Meet Its Requirements And Be Fit For Its Intended Use Is The
|
Cost Risks
|
Schedule Risks
|
Performance Risks
|
None Of The Given Choices
|
C
|
CS605
|
The Root Causes Of Project Failure Are
|
Lack Of User Input
|
Incomplete Requirement And Specification
|
Creeping Requirement
|
All Of The Given Options
|
D
|
CS605
|
Inspection Is A __________ Qa Technique
|
Fault Prevention Or Blocking
|
Fault Detection
|
Defect Prevention Through Error Blocking
|
None Of These
|
B
|
CS605
|
One Graphical Technique For Determining Whether A Process Exhibits Out-Of-Control Change Behavior Is A
|
Control Chart
|
Fishbone Diagram
|
Pareto Diagram
|
Process Diagram
|
A
|
CS605
|
When More Than One User Interpret The Same Requirement In Different Ways Then We Can Say That The Requirements Are
|
Incomplete
|
Ambiguous
|
Incorrect
|
None Of The Given
|
B
|
CS605
|
In _____________________ A Team Is Structured Along A Traditional Hierarchy Of Authority
|
Closed Paradigm
|
Synchronous Paradigm
|
Random Paradigm
|
Open Paradigm
|
A
|
CS605
|
Maintenance Phase In Software Process Focuses On
|
Why
|
What
|
How
|
Change
|
D
|
CS605
|
The Higher The Error Index The Higher Will Be The Defect Removal Efficiency
|
True
|
False
|
Na
|
Na
|
B
|
CS605
|
In ____________________ Team Organization There Is No Permanent Leader Rather There Are Task Coordinators
|
Controlled Decentralized
|
Democratic Decentralized
|
Controlled Centralized
|
Synchronous Paradigm
|
B
|
CS605
|
Pair Programming Is Associated With
|
Rad
|
Incremental Development
|
Extreme Programming
|
Prototyping
|
C
|
CS605
|
There May Be One Or More Guis That Are Part Of Any Good Software But May Not Satisfy Any Requirement
|
True
|
False
|
Na
|
Na
|
B
|
CS605
|
Poka Yoke Is The Name Of A
|
Japanese Dish
|
Qa Technique
|
Idiom
|
None Of The Given
|
B
|
CS605
|
Chart That Is Used To Develop The Individual Control Chart Is Called Statistical Control Techniques
|
True
|
False
|
Na
|
Na
|
A
|
CS605
|
Scm Is The Requirement Of The __________ Level(S) Of Cmm
|
First
|
Second And Later
|
Third And Later
|
Only Second
|
A
|
CS605
|
Testing And Software Quality Assurance Activities Are Exactly Similar Activities With Different Names
|
True
|
False
|
Na
|
Na
|
B
|
CS605
|
Level Of Cmm In Which Basic Project Management Processes Are Established To Track Cost Schedule And Functionality Is __________
|
Level 1
|
Level 2
|
Level 3
|
Level 4
|
B
|
CS605
|
There Are Tools Available In The Market For Project Tracking. These Tools Can Automatically Track And Manage The Project Replacing The Need Of Any Human Being As A Project Manager
|
True
|
False
|
Na
|
Na
|
B
|
CS605
|
Development Phase In Software Process Focuses On__________
|
Why
|
What
|
How
|
Change
|
C
|
CS605
|
In Order To Measure The Design Quality If The Frequency Of Ripple Defects Is Too Large Then It Means That There Is Tight Coupling And Hence The
|
Design Is Maintainable
|
Design Is Not Maintainable
|
Design Has Completed
|
None Of The Given
|
B
|
CS605
|
The Number Of People Required For A Software Project Is Determined
|
After An Estimate Of The Development Effort Is Made
|
From An Assessment Of The Technical Complexity Of The System
|
By The Size Of The Project
|
All Of The Given
|
D
|