CS605 Degree Of Uncertainty That The Product Will Meet Its Requirements And Be Fit For Its Intended Use Is The Cost Risks Schedule Risks Performance Risks None Of The Given Choices C
CS605 The Root Causes Of Project Failure Are Lack Of User Input Incomplete Requirement And Specification Creeping Requirement All Of The Given Options D
CS605 Inspection Is A __________ Qa Technique Fault Prevention Or Blocking Fault Detection Defect Prevention Through Error Blocking None Of These B
CS605 One Graphical Technique For Determining Whether A Process Exhibits Out-Of-Control Change Behavior Is A Control Chart Fishbone Diagram Pareto Diagram Process Diagram A
CS605 When More Than One User Interpret The Same Requirement In Different Ways Then We Can Say That The Requirements Are Incomplete Ambiguous Incorrect None Of The Given B
CS605 In _____________________ A Team Is Structured Along A Traditional Hierarchy Of Authority Closed Paradigm Synchronous Paradigm Random Paradigm Open Paradigm A
CS605 Maintenance Phase In Software Process Focuses On Why What How Change D
CS605 The Higher The Error Index The Higher Will Be The Defect Removal Efficiency True False Na Na B
CS605 In ____________________ Team Organization There Is No Permanent Leader Rather There Are Task Coordinators Controlled Decentralized Democratic Decentralized Controlled Centralized Synchronous Paradigm B
CS605 Pair Programming Is Associated With Rad Incremental Development Extreme Programming Prototyping C
CS605 There May Be One Or More Guis That Are Part Of Any Good Software But May Not Satisfy Any Requirement True False Na Na B
CS605 Poka Yoke Is The Name Of A Japanese Dish Qa Technique Idiom None Of The Given B
CS605 Chart That Is Used To Develop The Individual Control Chart Is Called Statistical Control Techniques True False Na Na A
CS605 Scm Is The Requirement Of The __________ Level(S) Of Cmm First Second And Later Third And Later Only Second A
CS605 Testing And Software Quality Assurance Activities Are Exactly Similar Activities With Different Names True False Na Na B
CS605 Level Of Cmm In Which Basic Project Management Processes Are Established To Track Cost Schedule And Functionality Is __________ Level 1 Level 2 Level 3 Level 4 B
CS605 There Are Tools Available In The Market For Project Tracking. These Tools Can Automatically Track And Manage The Project Replacing The Need Of Any Human Being As A Project Manager True False Na Na B
CS605 Development Phase In Software Process Focuses On__________ Why What How Change C
CS605 In Order To Measure The Design Quality If The Frequency Of Ripple Defects Is Too Large Then It Means That There Is Tight Coupling And Hence The Design Is Maintainable Design Is Not Maintainable Design Has Completed None Of The Given B
CS605 The Number Of People Required For A Software Project Is Determined After An Estimate Of The Development Effort Is Made From An Assessment Of The Technical Complexity Of The System By The Size Of The Project All Of The Given D