CS101
532
CS201
225
CS301
232
CS302
174
CS304
192
CS401
224
CS402
258
CS403
228
CS408
113
CS411
121
CS502
249
CS504
268
CS601
679
CS604
381
CS605
261
CS607
184
CS609
230
CS610
300
CS614
100
CS703
65
Code | Question | Option A | Option B | Option C | Option D | Answer | |
---|---|---|---|---|---|---|---|
CS605 | ################ | ################ | ################ | ################ | ################ | ################ | |
CS605 | ..........................Subgroups Are Those That The User Has The Option Of Using One Or None Of The Subgroups During An Elementary Process | Optional | Mandatory | None Of The Given | Ret | A | |
CS605 | __________ Activities Are Kind Of Umbrella Activities Used To Smoothly And Successfully Perform Construction Activities | Management | Requirement | Implimentation | All Of Given | A | |
CS605 | __________ Are The Set Of Key Process Area And Define The Tasks To Perform And The Order In Which They Are Performed | Requirement | Processes | Construction | Disciplined | B | |
CS605 | __________ Gives The Mean Time For Which System Remained Available For Use | Mttf | Mtbf | Mttr | Mttd | A | |
CS605 | __________ Help In Finding The Matrix To Be Stable Or Unstable | Control Chart Page | Directed Graph | Cyclic Chart | Base Line Graph | A | |
CS605 | __________ Integrates System And Software Disciplines Into Single Process Improvement Framework For Introducing New Disciplines As Needs Arise | Sei | Cmmi | Cmm | Iso | B | |
CS605 | __________ Is A Bad Smell When A Change Requires Lots Of Little Changes In A Lot Of Different Classes | Short Gun Surgery | Large Class | Duplicated Code | Lazy Class | A | |
CS605 | __________ Is A Pre-Requisite Of All Sorts Of Estimates Including Resources Time And Budget | Software Scope | Software Risk | Software Quality | Software Management | A | |
CS605 | __________ Is An Object Oriented Model | Spiral | Water Fall | Incremental | Fountain | D | |
CS605 | __________ Is Not The Management Part Of Software Development Activities | Coding | Configuration Management | Quality Assurance | Project Planning | A | |
CS605 | __________ Is The First Stage Of Waterfall Lifecycle Model | Requirement Definition | Operation | Unit Testing | Implementation | A | |
CS605 | __________ Is The Process Of Design Recovery. At This Stage The Documentation Of The Overall Functionality Is Created | Database Engineering | Reverse Engineering | Refactoring | Forward Engineering | B | |
CS605 | __________ Model Has A Major Drawback In That The Delivered Product May Not Fulfill The Customers Requirements | Water Fall | Build And Fix | Prototyping | Integrated Waterfall And Prototyping | D | |
CS605 | __________ Model Is Developed Keeping In Mind The Element Of Risk In The Development Of Software | Spiral | Rad | Incremental | Synchronize And Stabilize | A | |
CS605 | __________ Qa Technique Involves Typically Execution Of Software And The Observation Of Program Behavior Or Outcome | Inspection | Walkthroughs | Testing | Reviews | C | |
CS605 | __________ Teams Generate More And Better Solutions Than Individuals And Are Most Useful For Complex Problems | Decentralized | Centralized | Management | Marketing | A | |
CS605 | __________ Testing Verifies The Correct Implementation Of Internal Units Structures And Relationship Among Them | Black Box | White Box | Gray Box | None Of These | B | |
CS605 | ___________ Involves The Restructuring Of Database Or Database Schema | Data Restructuring | Code Restructuring | Process Restructuring | Design Restructuring | A | |
CS605 | ___________ Is Not The Part Of Software Development Loop | Status Quo | Problem Definition | Technical Development | Task Set | D |