Online Exam Preparation
MCQs Library
Browse subject-wise multiple choice questions, review answers quickly, and start a test from the same section.
Questions
| Code | Question | Option A | Option B | Option C | Option D | Answer |
|---|---|---|---|---|---|---|
| CS605 |
Vision Phase In Software Process Focuses On__________
|
Why
|
What
|
How
|
Change
|
A |
| CS605 |
Water Fall Model Is A Document Driven Model
|
True
|
False
|
Na
|
Na
|
A |
| CS605 |
We Can Include Following Item(S) During Configuration Item Identification
|
User Manuals And Documentations
|
Source Code
|
Software Requirement Specifications
|
All Of The Above
|
B |
| CS605 |
We Can Include Following Type Of Data In The Database For Creating Matrix Against Each Project Except
|
Name Of Project
|
Size Of Project
|
Company’S Ceo Name
|
Cost Of Project
|
C |
| CS605 |
We Modify The Internal __________In Code Re-Structuring
|
Data Structure
|
Interface
|
Design
|
Functionality
|
A |
| CS605 |
We Need To Employ Some Statistical Techniques And Plot The Result ---------------. This Is
Known As Statistical Control Techniques
|
Graphically
|
Automatically
|
Manually
|
Personally
|
A |
| CS605 |
When A Software Is Delivered To A Client And Then Client Reports The Bug In It Then That Bug Is Termed As
|
Error
|
Defect
|
Mistake
|
Fault
|
A |
| CS605 |
When An Item Is Base Lined It Becomes Frozen Here Frozen Means That The Item Can Be Changed Only By Creating An Old Version
|
True
|
False
|
Na
|
Na
|
B |
| CS605 |
When An Item Is Baselined It Becomes Frozen Here Frozen Means That The Item Can Be Changed Only By Creating An Old Version
|
True
|
False
|
Na
|
Na
|
B |
| CS605 |
When More Than One User Interpret The Same Requirement In Different Ways Then We Can Say That The Requirements Are
|
Incomplete
|
Ambiguous
|
Incorrect
|
None Of The Given
|
B |
| CS605 |
Which Is Not Correct In The Context Of Poka-Yoke Technique?
|
Simple And Cheap
|
Sophisticated And Expensive
|
Part Of Process
|
Indication Point Should Be Near To The Place Where The Problem Occurred
|
B |
| CS605 |
Which Of These Software Characteristics Are Used To Determine The Scope Of A Software Project?
|
Context Lines Of Code Function
|
Context Function Communication Requirements
|
Information Objectives Function Performance
|
Communications Requirements Performance Information Objectives
|
D |
| CS605 |
Which One Is Not The Software Project Planning Activity Carried Out By The Project Manager For Estimation?
|
Software Scope Estimation
|
Resources Requirements
|
Time Requirements
|
Product Quality
|
D |
| CS605 |
Which One Of The Following Describes The Data And Control To Be Processed Function Performance Constraints Interfaces And Reliability?
|
Resources Requirements
|
Software Scope Estimation
|
Time Requirements
|
Product Quality
|
B |
| CS605 |
Which One Of The Following Does Not Belong To A Strategy For Dealing With Risk?
|
Risk Avoidance
|
Security Risk Assessment
|
Risk Monitoring
|
Risk Management And Contingency Planning
|
B |
| CS605 |
Which One Of The Following Is Not A Useful Indicator Of Software Quality?
|
Correctness
|
Code Size
|
Maintainability
|
Integrity
|
B |
| CS605 |
While Assessing A Legacy System For Further Decision One Should Decide The Following About The
|
Is Supplier Still In Existence?
|
Is Supplier Still In Business?
|
Is Supplier Can Provide Support?
|
All Of The Given
|
D |
| CS605 |
While Performing Risk Analysis The Impact Of Risk Can Not Be Measured Quantitatively
|
True
|
False
|
Na
|
Na
|
B |
| CS605 |
While Testing An Application We Can Intentionally Inject Bugs In A Software Application To Find The Conformity With The Perceived Functionality
|
True
|
False
|
Na
|
Na
|
A |
| CS605 |
With A Complex Class You Have To Move Data And Methods Around In Small Pieces To Avoid Errors It Seems Slow But It Is The …………………Because You Avoid Debugging
|
Quickest
|
Problem
|
None Of The Given
|
Slowest
|
A |