CS101
532
CS201
225
CS301
232
CS302
174
CS304
192
CS401
224
CS402
258
CS403
228
CS408
113
CS411
121
CS502
249
CS504
268
CS601
679
CS604
381
CS605
261
CS607
184
CS609
230
CS610
300
CS614
100
CS703
65
Code | Question | Option A | Option B | Option C | Option D | Answer | |
---|---|---|---|---|---|---|---|
CS605 | Check In And Check Out Is Actually One And The Same Process With Two Different Names | True | False | Na | Na | A | |
CS605 | Check-In And Check-Out Are Actually One And The Same Processes With Two Different Names | True | False | Na | Na | B | |
CS605 | Cmm Is Developed By Sei To Judge The__________Of An Organization | Process Maturity Level | Process Maturity Model | Process Maturity Techniques | None Of These | A | |
CS605 | Cmm Is Developed By__________ | Software Engineering Institute | Ieee | Ansi | None Of These | A | |
CS605 | Cmm Is Divided Into__________ Different Levels | 3 | 4 | 5 | 6 | C | |
CS605 | Cmm Stands For__________ | Critical Maturity Model | Capability Maturity Model | Critical Model Maturity | Capability Model Maturity | B | |
CS605 | Coding Is Not More Than___________The Whole Effort Of Software Development | 12-13% | 13-14% | 14-15% | 15-16% | B | |
CS605 | Configuration Management Can Be Used While The Project Is In The __________ Phase | Testing | Development | Maintenance | All Of The Given | D | |
CS605 | Construction Of Software Related To__________ | Requirement Gathering | Design & Coding | Testing | All Of Given | D | |
CS605 | Coper Jones Divided The Software Activities Into__________Different Categories | 24 | 25 | 26 | 27 | B | |
CS605 | Coupling And Cohesion Are The Quality Factor Of The Software | External | Internal | Both External And Internal | None Of The Given | B | |
CS605 | Defect Per Unit Function Point Is A | Measure | Metric | Measurement | None Of The Above | B | |
CS605 | Defect Removal Efficiency (Dre) Can Be Measured By Where E Is Errors Found Delivery And D Is Error Found After Delivery (Typically Within The First Year Of Operation) | Dre= E/ (E+D) | Dre= E - (E+D) | Dre= E * (E+D) | None Of The Given | A | |
CS605 | Defect Removal Efficiency Can Be Increased By | By Increasing The Team Member In A Team | Identifying The Defect In Early Stages Of Development So That It May Not Be Amplified | Identifying The Detect In The Later Stages Of Project | By Performing The Testing Activity Only | B | |
CS605 | Definition Phase In Software Process Focuses On___________ | Why | What | How | Change | B | |
CS605 | Degree Of Uncertainty That The Product Will Meet Its Requirements And Be Fit For Its Intended Use Is The | Cost Risks | Schedule Risks | Performance Risks | None Of The Given Choices | C | |
CS605 | Determination Of The ....................Is A Pre-Requisite Of All Sorts Of Estimates Including Resources Time And Budget | Software Scope | Software Risk | Software Quality | Software Management | A | |
CS605 | Development Phase In Software Process Focuses On__________ | Why | What | How | Change | C | |
CS605 | During The Construction Of Software Defects Can Be Prevented From Being Injected In Software With The Help Of | Proper Education And Training Of Software Engineers | Use Of Formal Methods | Use Of Appropriate Tools For Testing | All Of The Given Option Are Correct | A | |
CS605 | Each Process Defines Certain Deliverables Known As__________ | Work Products | Software Process | Software Products | Work Process | A |