CS605
|
There Are Tools Available In The Market For Project Tracking. These Tools Can Autmomatically Track And Manage The Project Replacing The Need Of Any Human Being As A Project Manager
|
True
|
False
|
Na
|
Na
|
B
|
CS605
|
When A Software Is Delivered To A Client And Then Client Reports The Bug In It Then That Bug Is Termed As
|
Error
|
Defect
|
Mistake
|
Fault
|
A
|
CS605
|
__________Testing Verifies The Correct Handling Of The External Functions Provided By The Software
|
Black Box
|
White Box
|
Gray Box
|
None Of These
|
A
|
CS605
|
The Processes At ----------- Is Focus On Continually Improving Process Performance Through Both Incremental And Innovative Technological Changes/Improvements
|
Level 5
|
Level 1
|
Level 4
|
Level 3
|
A
|
CS605
|
The Process Of Rediscovering The Software Design Is Called
|
Reverse Engineering
|
Business Engineering
|
Business Process Engineering
|
Forward Engineering
|
A
|
CS605
|
Fast Is The Abbreviation Of
|
Facilitated Application Specification Technology
|
Facilitated Application Specification Technique
|
Facilitated Application Specialization Technique
|
None Of The Above Option
|
B
|
CS605
|
Construction Of Software Related To__________
|
Requirement Gathering
|
Design & Coding
|
Testing
|
All Of Given
|
D
|
CS605
|
Following Are Effective Guidelines For Review Except
|
We Need To Review The Product Not The Producer
|
Be Sensitive To Personal Egos
|
Errors Should Be Pointed Out Gently
|
Tone Should Be High And Strict
|
D
|
CS605
|
__________ Integrates System And Software Disciplines Into Single Process Improvement Framework For Introducing New Disciplines As Needs Arise
|
Sei
|
Cmmi
|
Cmm
|
Iso
|
B
|
CS605
|
The Cmm Level In Which The Software Process Is Characterized As Ad-Hoc Is __________
|
Level 1
|
Level 2
|
Level 3
|
Level 4
|
A
|
CS605
|
The Change Control Authority Does Not Have The Rights To Permit The Change In The Software
|
True
|
False
|
Na
|
Na
|
B
|
CS605
|
Several Entities Are Always Created -------------- And Deleted Together Then This Is A Strong Indication That They Should Be Grouped Into ---------- Logical File/Files
|
Together Single
|
Together Multiple
|
Together Double
|
All Of The Given
|
A
|
CS605
|
If An Error Related To Requirements Is Identified In Testing Phase So This Error Will Be Considered As An Error In __________ Phase
|
Design
|
Code
|
Requirement
|
Testing
|
D
|
CS605
|
Traceability Of Requirements Is Helpful In The Following Except
|
Preparing Test Cases
|
Finding Uses Cases For A Particular Requirement
|
Managing The Schedule And Budget Of The Project
|
Identifying Guis For A Particular Requirement
|
C
|
CS605
|
Following Are The Components Of A Legacy System Except
|
Business Processes
|
System Hardware
|
Marketing
|
Application Software
|
C
|
CS605
|
In _____________________ There Is Both Vertical And Horizontal Communication
|
Democratic Decentralized (Dd)
|
Controlled Decentralized (Cd)
|
Controlled Centralized (Cc)
|
Synchronous Paradigm (Sp)
|
B
|
CS605
|
__________ Is Not The Management Part Of Software Development Activities
|
Coding
|
Configuration Management
|
Quality Assurance
|
Project Planning
|
A
|
CS605
|
In A Complex System That Will Lead To Much ………..Code To Write And Maintain
|
More
|
Less
|
Meaningless
|
None Of The Given
|
A
|
CS605
|
In __________ Representation Of Cmmi Model Consideration Is Given To Improve Selected Processes Areas
|
Staged
|
Continuous
|
Both
|
None Of The Given
|
B
|
CS605
|
__________ Is A Pre-Requisite Of All Sorts Of Estimates Including Resources Time And Budget
|
Software Scope
|
Software Risk
|
Software Quality
|
Software Management
|
A
|