Code Question Option A Option B Option C Option D Answer
CS605 ___________ Phase In A Software Process Focuses On Change Vision Maintenance Definition Development B
CS605 Effective Software Project Management Focuses On The Four P’S: These Are People Product Process Problem People Product Process Project People Passion Process Project People Passion Planning Project B
CS605 If Configuration Item Identification Is Not Identified It Is Possible To Control Changes And Establish Records True False Na Na B
CS605 The Situation In Software Development Loop Where We Actually Deploy The New System At User Site Is Called__________ Status Quo Technical Development Solution Integration None Of These A
CS605 In ____________________ Model The Product Is Developed Without Any Proper Design And Specifications Water Fall Build And Fix Prototyping None Of The Given B
CS605 If A New Version Of A Product Is Released By Fixing The Bugs In The Previous Release Then It Is Termed As __________ Product Update Product Upgrade Defect Removal Product Performance B
CS605 Spiral Model Has __________ Dimensions 2 3 4 None Of The Above A
CS605 Object Un-Lock Is Done By Check In Check Out Both Check-In And Check-Out None Of The Given A
CS605 In………………….. Stage Of Software Development Loop We Try To Determine What Is The Problem Against Which We Are Going To Develop Software Problem Definition Technical Development Construction Implimentation A
CS605 _____________________Provides Automated Or Semi Automated Support For Software Processes Methods And Quality Control Tools Methods Processes Functions A
CS605 __________ Is An Object Oriented Model Spiral Water Fall Incremental Fountain D
CS605 Following Factors Should Be Considered While Assessing The Legacy System Except Age Of Hardware And Software Failure Rate Support Requirement Name Of The Client D
CS605 Coding Is Not More Than___________The Whole Effort Of Software Development 12-13% 13-14% 14-15% 15-16% B
CS605 The __________ Model Of Software Development Is A Good Approach When Core Product Is Required Quickly Incremental Linear Sequential Prototyping None Of The Above C
CS605 In __________ New User And Technology Requirement Can Also Be Integrated Into The Re-Engineering Effort Backward Re-Engineering Forward Re-Engineering Business Engineering Business Process Engineering B
CS605 Phases Of A Software System Are__________ Vision Definition Definition Development Development Maintenance All Of Given D
CS605 When An Item Is Base Lined It Becomes Frozen Here Frozen Means That The Item Can Be Changed Only By Creating An Old Version True False Na Na B
CS605 Software Development Activities Could Be Performed In A Cycle And That Cycle Is Called__________ Software Development Loop Software Development Life Cycle Na Na A
CS605 Every Node Signifies __________ Version Of A Release One Two Three Four B
CS605 Which Of These Software Characteristics Are Used To Determine The Scope Of A Software Project? Context Lines Of Code Function Context Function Communication Requirements Information Objectives Function Performance Communications Requirements Performance Information Objectives D