Code | Question | Option A | Option B | Option C | Option D | Answer | |
---|---|---|---|---|---|---|---|
CS605 | In Function Point Analysis Technique Eo Stands For | Export Operation | Export Output | External Output | None Of These | C | |
CS605 | In Measuring Software Process Quality By Using Control Charts If The Gap Between The Defects Reported And Defects Fixed Is Increasing Then It Means | The Product Is In Unstable Condition | The Product Is Ready For Shipment | The Product Is In Stable Condition | None Of The Above | A | |
CS605 | In Order To Measure The Design Quality If The Frequency Of Ripple Defects Is Too Large Then It Means That There Is Tight Coupling And Hence The | Design Is Maintainable | Design Is Not Maintainable | Design Has Completed | None Of The Given | B | |
CS605 | In Software Development ____________________ Is Performed At The End Of Each Phase | Verification | Validation | Both | None Of The Above | A | |
CS605 | In Software Development Loop Once We Get New Requirements Then We Need To Change The__________ | Status Quo | Technical Development | Solution Integration | None Of These | A | |
CS605 | In The Software Development Life Cycle Soon The Defect Is Detected Will Results In | Increase In Cost Of Software | Decrease In Software Cost | Both A And B Are Correct | None Of These | B | |
CS605 | In Version Control Process If We Opt X.Y.Z As A Standard Where X Signifies Major Upgrade Y Signifies Minor Upgrades And Z Signifies Updates (Bug Fixing). Here __________ Variable(S) Can Be Changed At A Time | 1 | 2 | 3 | 4 | A | |
CS605 | In………………….. Stage Of Software Development Loop We Try To Determine What Is The Problem Against Which We Are Going To Develop Software | Problem Definition | Technical Development | Construction | Implimentation | A | |
CS605 | In………………….. Stage Of Software Development Loop We Try To Find The Solution Of The Problem On Technical Grounds And Base Our Actual Implantations On It | Problem Definition | Technical Development | Both | None Of These | B | |
CS605 | Incomplete Configuration Identification Documents May Result In | Defective Product | Higher Maintenance Costs | Schedule Product | All Of The Given Choices Are Correct | D | |
CS605 | Incomplete Configuration Identification Documents May Result In: (A) Defective Product (B) Higher Maintenance Costs (C) Schedule Product (D) Meet Software Quality | A B C | B C D | A B D | A C D | A | |
CS605 | Incomplete Requirements Gathering Can Result In The __________ Of The Project | Failure | Reusability | Success | Easy Maintenance | A | |
CS605 | Inspection Is A __________ Qa Technique | Fault Prevention Or Blocking | Fault Detection | Defect Prevention Through Error Blocking | None Of These | B | |
CS605 | Inspection Is A Qa Technique Which Is Used To Detect And Remove Faults In | Code & Design | Test Plans | Requirement Specifications | All Of The Given | D | |
CS605 | Integrity Means That The Software Should | Help The Users To Enjoy Usability | Withstand The Attack From A Hacker | Help The Hacker To Hack The System | None Of The Given | B | |
CS605 | Is A Linear Sequential Model | Build & Fix Model | Waterfall Model | Rad | None Of These | B | |
CS605 | Large Classes Reduces | Cohesion | Coupling | Consistency | Chains | A | |
CS605 | Legacy System Migration Is Usually Hard. One Important Reason Is That No Proper Documentation Of The System Is Available | True | False | Na | Na | A | |
CS605 | Level ___________ Is The Lowest Capability Level Of Cmmi In Continuous Representation | 0 | 1 | 5 | 6 | A | |
CS605 | Level Of Cmm In Which Basic Project Management Processes Are Established To Track Cost Schedule And Functionality Is __________ | Level 1 | Level 2 | Level 3 | Level 4 | B |