Code Question Option A Option B Option C Option D Answer
CS605
Level Of Cmm In Which Process For Both Management Engineering Activities Is Documented Standardized And Integrated Into An Organized Software Process Is____________________
Level 1
Level 2
Level 3
Level 4
C
CS605
Levels Of Cmm Are Characterized As____________________
Initial Repeatable
Defined Managed
Optimizing
All Of Given
D
CS605
Main Characteristic Of __________ Model Is Risk Analysis And Management
Waterfall
Rad
Spiral
Incremental
C
CS605
Maintenance Phase In Software Process Focuses On
Why
What
How
Change
D
CS605
Management Activities Are Related To__________
Project Planning Management
Configuration Management & Sqa
Installation And Training
All Of Given
D
CS605
Mean Time To Repair (Mttr) Is The
Time When System Remained Unable For Usage
Time Taken To Fix The Error
Time Taken To Repair The Software
All Of The Given Options Are Correct.
C
CS605
Metrics To Assess The Quality Of The Analysis Models And The Corresponding Software Specification Were Proposed ............
In 1993- 1999
Ricado In 1993
Davis In 1990
Davis In 1993
D
CS605
Miscommunication Among Project Staff Is One Of The Reasons Of The Failure Of The Software Project
True
False
Na
Na
A
CS605
Moi Model Of Leadership Stands For
Motivation Operationalize Integration
Misunderstanding Object Ideas
Motivation Organization Innovation
Miscommunication Organization Invention
C
CS605
Most Recent Data Is More Relevant While Assessing The Progress At A Given Point Of Time
True
False
Na
Na
A
CS605
Mttc Is The Abbreviation Of
Measured Time To Change
Mean Time To Collaborate
Mean Time To Change
Measure Time To Cope
C
CS605
Now Days ……………. Language Is Widely Being Used
C++
Java
Ada
Oop
D
CS605
Object Un-Lock Is Done By
Check In
Check Out
Both Check-In And Check-Out
None Of The Given
A
CS605
One Graphical Technique For Determining Whether A Process Exhibits Out-Of-Control Change Behavior Is A
Control Chart
Fishbone Diagram
Pareto Diagram
Process Diagram
A
CS605
Pair Programming Is Associated With
Rad
Incremental Development
Extreme Programming
Prototyping
C
CS605
Phase Index Can Be Calculated By The Help Of The Following Formula
Pii = Ws(Si/Ei) + Wm(Mi/Ei) + Wt(Ti/Ei)
Pii = Ws(Si/Ei) + Wm(Mi/Mi) + Wt(Ti/T)
Pii = Ws(Si/Ei) + Wm(Mi/Mi) + Wt(Ti/Ei)
Pii = Ws(Si/S) + Wm(Mi/M) + Wt(Ti/E)
A
CS605
Phases Of A Software System Are__________
Vision Definition
Definition Development
Development Maintenance
All Of Given
D
CS605
Poka Yoke Is Japanese Term And It Means
Mistake Proofing
Mistake Handling
Mistake Identification
Mistake Assurance
A
CS605
Poka Yoke Is The Name Of A
Japanese Dish
Qa Technique
Idiom
None Of The Given
B
CS605
Proactive Risk Management Philosophy Is Also Some Times Termed As Indiana Jones School Of Risk Management
True
False
Na
Na
B