Questions
| Code | Question | Option A | Option B | Option C | Option D | Answer |
|---|---|---|---|---|---|---|
| CS605 |
Level Of Cmm In Which Process For Both Management Engineering Activities Is Documented Standardized And Integrated Into An Organized Software Process Is____________________
|
Level 1
|
Level 2
|
Level 3
|
Level 4
|
C |
| CS605 |
Levels Of Cmm Are Characterized As____________________
|
Initial Repeatable
|
Defined Managed
|
Optimizing
|
All Of Given
|
D |
| CS605 |
Main Characteristic Of __________ Model Is Risk Analysis And Management
|
Waterfall
|
Rad
|
Spiral
|
Incremental
|
C |
| CS605 |
Maintenance Phase In Software Process Focuses On
|
Why
|
What
|
How
|
Change
|
D |
| CS605 |
Management Activities Are Related To__________
|
Project Planning Management
|
Configuration Management & Sqa
|
Installation And Training
|
All Of Given
|
D |
| CS605 |
Mean Time To Repair (Mttr) Is The
|
Time When System Remained Unable For Usage
|
Time Taken To Fix The Error
|
Time Taken To Repair The Software
|
All Of The Given Options Are Correct.
|
C |
| CS605 |
Metrics To Assess The Quality Of The Analysis Models And The Corresponding Software Specification Were Proposed ............
|
In 1993- 1999
|
Ricado In 1993
|
Davis In 1990
|
Davis In 1993
|
D |
| CS605 |
Miscommunication Among Project Staff Is One Of The Reasons Of The Failure Of The Software Project
|
True
|
False
|
Na
|
Na
|
A |
| CS605 |
Moi Model Of Leadership Stands For
|
Motivation Operationalize Integration
|
Misunderstanding Object Ideas
|
Motivation Organization Innovation
|
Miscommunication Organization Invention
|
C |
| CS605 |
Most Recent Data Is More Relevant While Assessing The Progress At A Given Point Of Time
|
True
|
False
|
Na
|
Na
|
A |
| CS605 |
Mttc Is The Abbreviation Of
|
Measured Time To Change
|
Mean Time To Collaborate
|
Mean Time To Change
|
Measure Time To Cope
|
C |
| CS605 |
Now Days ……………. Language Is Widely Being Used
|
C++
|
Java
|
Ada
|
Oop
|
D |
| CS605 |
Object Un-Lock Is Done By
|
Check In
|
Check Out
|
Both Check-In And Check-Out
|
None Of The Given
|
A |
| CS605 |
One Graphical Technique For Determining Whether A Process Exhibits Out-Of-Control Change Behavior Is A
|
Control Chart
|
Fishbone Diagram
|
Pareto Diagram
|
Process Diagram
|
A |
| CS605 |
Pair Programming Is Associated With
|
Rad
|
Incremental Development
|
Extreme Programming
|
Prototyping
|
C |
| CS605 |
Phase Index Can Be Calculated By The Help Of The Following Formula
|
Pii = Ws(Si/Ei) + Wm(Mi/Ei) + Wt(Ti/Ei)
|
Pii = Ws(Si/Ei) + Wm(Mi/Mi) + Wt(Ti/T)
|
Pii = Ws(Si/Ei) + Wm(Mi/Mi) + Wt(Ti/Ei)
|
Pii = Ws(Si/S) + Wm(Mi/M) + Wt(Ti/E)
|
A |
| CS605 |
Phases Of A Software System Are__________
|
Vision Definition
|
Definition Development
|
Development Maintenance
|
All Of Given
|
D |
| CS605 |
Poka Yoke Is Japanese Term And It Means
|
Mistake Proofing
|
Mistake Handling
|
Mistake Identification
|
Mistake Assurance
|
A |
| CS605 |
Poka Yoke Is The Name Of A
|
Japanese Dish
|
Qa Technique
|
Idiom
|
None Of The Given
|
B |
| CS605 |
Proactive Risk Management Philosophy Is Also Some Times Termed As Indiana Jones School Of Risk Management
|
True
|
False
|
Na
|
Na
|
B |