CS605
|
___________ Is Not The Part Of Software Development Loop
|
Status Quo
|
Problem Definition
|
Technical Development
|
Task Set
|
D
|
CS605
|
Using __________ Developer Can Build A Product That Is Reworked As Many Times As Needed To Satisfy The Client
|
Build & Fix Model
|
Waterfall Model
|
Rad
|
None Of These
|
A
|
CS605
|
A Redesigned Business Process Must Be Prototyped Before It Is Fully Integrated Into The Business
|
True
|
False
|
Na
|
Na
|
A
|
CS605
|
There Could Be__________Technique To Perform A Task
|
More Than One
|
Only One
|
Only Two
|
Infinite
|
A
|
CS605
|
While Performing Risk Analysis The Impact Of Risk Can Not Be Measured Quantitatively
|
True
|
False
|
Na
|
Na
|
B
|
CS605
|
In Code Restructuring We Do Not Change The Functionality Of The Code
|
True
|
False
|
Na
|
Na
|
B
|
CS605
|
Incomplete Requirements Gathering Can Result In The __________ Of The Project
|
Failure
|
Reusability
|
Success
|
Easy Maintenance
|
A
|
CS605
|
In Function Point Analysis Technique Eo Stands For
|
Export Operation
|
Export Output
|
External Output
|
None Of These
|
C
|
CS605
|
Configuration Management Can Be Used While The Project Is In The __________ Phase
|
Testing
|
Development
|
Maintenance
|
All Of The Given
|
D
|
CS605
|
Defect Removal Efficiency (Dre) Can Be Measured By Where E Is Errors Found Delivery And D Is Error Found After Delivery (Typically Within The First Year Of Operation)
|
Dre= E/ (E+D)
|
Dre= E - (E+D)
|
Dre= E * (E+D)
|
None Of The Given
|
A
|
CS605
|
Cmm Is Divided Into__________ Different Levels
|
3
|
4
|
5
|
6
|
C
|
CS605
|
Check In And Check Out Is Actually One And The Same Process With Two Different Names
|
True
|
False
|
Na
|
Na
|
A
|
CS605
|
The Need For Business Process Re-Engineering Arrives Because The
|
Way To Conduct Business Changes
|
Income Of The Company Increases
|
Company Want To Become Popular
|
Way Of Programming Changes With Time
|
A
|
CS605
|
Quality Is The Compliance Of Software To Implicit And Explicit Quality Factors.
Identify The Explicit Requirement From The Following
|
Maintainability
|
Compliance With Cmmi
|
Efficiency
|
Ease Of Use
|
B
|
CS605
|
Se Is Nothing But A__________To Software Development
|
Disciplined
|
Systematic Approach
|
Both A & B
|
None Of These
|
C
|
CS605
|
The Amount Of Computing Resources Required By A Program To Perform Its Function Is __________
|
Efficiency
|
Integrity
|
Reliability
|
None Of Given
|
A
|
CS605
|
__________ Is The First Stage Of Waterfall Lifecycle Model
|
Requirement Definition
|
Operation
|
Unit Testing
|
Implementation
|
A
|
CS605
|
Mean Time To Repair (Mttr) Is The
|
Time When System Remained Unable For Usage
|
Time Taken To Fix The Error
|
Time Taken To Repair The Software
|
All Of The Given Options Are Correct.
|
C
|
CS605
|
__________ Activities Are Kind Of Umbrella Activities Used To Smoothly And Successfully Perform Construction Activities
|
Management
|
Requirement
|
Implimentation
|
All Of Given
|
A
|
CS605
|
By Default Every Organization Would Be At…………… Of Cmm
|
Level 1
|
Level 2
|
Level 3
|
Level 4
|
A
|