CS605
Process Discipline Is Unlikely To Be Rigorous But Where It Exists It May Help To Ensure That Existing Processes Are Maintained During Times Of Stress And This Is Done At Cmm Level ---------
1
2
3
4
B
CS605
Qualitative Feedbacks Are Associated With__________ Level Of Cmm
Level 2
Level 3
Level 4
Level 5
D
CS605
Quality Costs May Be Divided Into Costs Associated With
Prevention Appraisal And Failure
People Process And Product
Customers Developers And Maintenance
All Of The Given
A
CS605
Quality Is The Compliance Of Software To Implicit And Explicit Quality Factors. Identify The Explicit Requirement From The Following
Maintainability
Compliance With Cmmi
Efficiency
Ease Of Use
B
CS605
Quantitative Process-Improvement Objectives For The Organization Are Established Continually Revised To Reflect Changing Business Objectives At -------------
Level 1
Level 2
Level 3
Level 5
C
CS605
Rapid Application Development Is Another Form Of __________
Prototyping Model
Incremental Model
Linear Sequential Model
None Of The Above
B
CS605
Reliability And Safety Are Same Concepts With Respect To Software Quality
True
False
Na
Na
A
CS605
Reliability Of A Software Is A
Functional Requirement
Non-Functional Requirement
Design Requirement
None Of The Given
B
CS605
Requirements Engineering Is The Basis Of The Contract Between The Developer And The Client
True
False
Na
Na
B
CS605
Review Is A Type Of ___________ That Helps Preventing The Bugs To Move In The Next Stage Of Software Development
Bug Seeding Tool
Filter
Alarm
None Of The Given
B
CS605
Review Meeting Is Attended By The Following Except
Review Leader
All Reviewers
Ceo
Product Producer
C
CS605
Scm Is The Requirement Of The __________ Level(S) Of Cmm
First
Second And Later
Third And Later
Only Second
A
CS605
Se Has Associated __________ With Each Maturity Level
Key Process Areas
Balancing Act
Solution Integration
Status Quo
A
CS605
Se Is Actually A___________
Balancing Act
Programming Technique
Balancing Technigue
Balancing Program
A
CS605
Se Is Nothing But A__________To Software Development
Disciplined
Systematic Approach
Both A & B
None Of These
C
CS605
Se Is The Set Or The Combination Of Processes And Tools To Develop Software
True
False
Na
Na
A
CS605
Several Entities Are Always Created -------------- And Deleted Together Then This Is A Strong Indication That They Should Be Grouped Into ---------- Logical File/Files
Together Single
Together Multiple
Together Double
All Of The Given
A
CS605
Should Be Technically And Organizationally In Place To Enable The Organization To Meet The Commitments
Activities
Abilities
Methods
None Of These
B
CS605
Software Availability Can Be Calculated By The Following Equation
Availability = (Mttr/Mttf) X 100
Availability = (Mtbf/Mttr) X 100
Availability = (Mttf/Mtbf) X 100
Availability = (Mtbf/Mttf) X 100
C
CS605
Software Configuration Management Is Used To
Manage Change In The Software
Mange The Financials Accounts In An Organization
Manage The Administration Of Company
All Of The Given
A